Renewable energy will contribute significantly to Sasol’s 30% GHG reduction target by 2030, with over 10 million tonnes of emissions expected to be avoided through current PPAs alone.
Southern Africa:
- Through our self-build and renewable energy procurement programme we have secured ~920MW in SA:
- ~688W was procured jointly with Air Liquide
- ~232 MW was procured by Sasol only (incl. a 3.3MW self build PV facility)
- 69 MW (Msenge Project) has achieved Commercial Operations.
- Damlaagte, 97.5MW online by mid-August 2025.
- The remaining projects are phased, and will come online in the next 2 – 3 years.
- Shifts in the regulatory environment now allow us to sell excess electricity. We have therefore lifted our 2030 target from the original 1,2 GW to more than 2 GW.
International Chemicals:
- A 93MW Virtual Power Purchase Agreement (VPPA) signed with Akuo in June 2025 will supply ~50% of Lake Charles’ power needs from mid-FY27